Due to regular daytime power consumption across classrooms, basic lab setups, and administrative offices, Jai Jai Har High School was facing consistently high monthly electricity bills. Looking for a dependable way to curb energy costs while adopting clean green energy, the school management decided to invest in solar power. After learning about our prior installations and receiving positive feedback and referrals from satisfied clients in the region, they reached out to our team for an initial consultation.
- Consultation, Transparency & Negotiations
- We are one firm with a shared sense of purpose
- We care about each other and the world around us
Upon receiving their inquiry, our technical team conducted an on-site rooftop feasibility survey to analyze the shadow-free space, structural strength, and daily energy load patterns. Based on the assessment, we custom-engineered a high-efficiency 3.6 kW on-grid solar system equipped with top-tier solar panels and a reliable grid-tied inverter. The entire installation was executed strictly following safety standards without disrupting ongoing classes, followed by seamless net-metering liaison and final grid commissioning.
Over the last 2019 Year we made an impact, we have long way to go.
To ensure the solution aligned with the school’s budget, we provided a clear Return on Investment (ROI) and payback analysis outlining the estimated daily generation and monthly bill savings. We maintained complete transparency during the pricing discussions and negotiations, offering high-grade Tier-1 components alongside flexible payment terms. This open and practical approach ensured a smooth agreement that met the school’s financial expectations without compromising on equipment quality.
While multiple solar vendors were considered, the management placed their trust in our brand due to our technical expertise, end-to-end service support, and transparent communication. Our proven track record of timely government net-metering approvals, prompt post-installation after-sales service, and reliable 25-year panel performance warranty gave them total confidence in awarding the project to us.
Documents Collection
Site Survey & Requirement Analysis
System Design & Proposal
Apply Subsidy Application & Other Approvals Process
Material Procurement
Installation & Setup Process
Plant Inspection & Net Metering Process
System Activation
Warranty & Monitoring Support
Chilakala Lakshmi
Jai Jawahar High School, Suraksha Enclave.Chilakala Lakshmi
Jai Jawahar High School, Suraksha Enclave.Project Information
Suraksha Enclave, T.G State
Installation
30 July 2026 - 12 Aug 2026